Coldwater
River Structure Rehabilitation
This project involved the rehabilitation
of two bridges over the Coldwater River near the town of Coldwater.
Work included extensive repairs to the deck surface, replacement of
the parapet walls, and repairs to the abutments. Single lane traffic
was maintained through the use of Temporary traffic control signals.
Another aspect of the project was the installation of a large
drainage culvert by jack and bore method.